Storage Period
7 storage months (16.09.2026 - 31.03.2027)
Working Gas Volume
42 350 378 kWh
Max. Injection Output
617 972 kWh/day
Max. Withdrawal Output
766 542 kWh/day
Max. filling time of 90 % of capacity
15.12.2026 (90 days)
5.3.2024 | (5551x)
Auction Date: 14 March 2024, 10 a.m. (CET)
Type of storage capacity reserved: Monthly storage capacity - only the fixed withdrawal output
Withdrawal output: 5 000 MWh/day
Storage period: from 1 April 2024, 6 a.m., and ending on 1 April 2025, 6 a.m.
For additional information please contact: auction@mnd-es.cz
Josef Brůček Tel.: +420 775 877 182
Filip Červenka Tel.: +420 775 875 092