CURRENT

Operational information

Total available withdrawal and injection capacities
From
To

Values in the table are only indicative.

Date Total available withdrawal capacity (MWh/day) Total available injection capacity (MWh/day)
27.7.2024 88 206 26 845
26.7.2024 88 206 26 834
25.7.2024 88 207 26 834
24.7.2024 88 211 26 834
23.7.2024 88 207 28 649
22.7.2024 88 207 28 815
21.7.2024 88 211 28 815
20.7.2024 88 207 28 815
19.7.2024 88 207 28 981
Total contracted withdrawal and injection capacities
From
To

Values in the table are only indicative.

Date Total contractual withdrawal capacity (MWh/day) Total contractual injection capacity (MWh/day)
27.7.2024 73 211 26 845
26.7.2024 73 211 26 834
25.7.2024 73 211 26 834
24.7.2024 73 211 26 834
23.7.2024 73 211 28 649
22.7.2024 73 211 28 815
21.7.2024 73 211 28 815
20.7.2024 73 211 28 815
19.7.2024 73 211 28 981
Interrupted interruptible capacity and price
From
To
Date Withdrawals (MWh/day) Injections (MWh/day) Price
26.7.2024 0 0 0
Size of interrupted firm storage capacity
From
To
Date Withdrawals (MWh/day) Injections (MWh/day)
26.7.2024 0 0
Actual stock level and daily values of injection and withdrawal
From
To
Date Current capacity in MWh Withdrawals (MWh/day) Injections (MWh/day)
26.7.2024 3 476 175 5 3 133
Storage capacity
Year Total technical capacity (GWh) Contracted capacity (GWh)  Free capacity (GWh)
2024/25 3,630 3,630 0
2025/26 3,630 3,484.4 145.6
2026/27 3,630 3,082 548
Storage Development – Capacity and Outputs
 Storage Year  Working Gas Volume [GWh] Max. contractual withdrawals [GWh/day] Max. contractual injections [GWh/day]
 
2029 3,650 98 60
2028 3,650 98 60
2027 3,650 98 60
2026 3,630 98 60
2025 3,630 98 60
2024 3,630 98 60
2023 3,696 98 60
2022 3,420 96 59
2021 3,420 107 59
Shutdowns and maintenance
Shutdown date  Reduction in daily storage during the shutdown in %  Type of shutdown Note 
   Daily injections Daily withdrawals   
14.5. 06:00 - 17.5. 06:00 2024 100% 100% planned Maintenance at MS Brumovice
9.9. 06:00 - 23.9. 06:00 2024 100% 100% planned Regular maintenance at UGS Uhřice
11.9. 06:00 - 24.9. 06:00 2023 100% 100% planned Regular maintenance at UGS Uhřice
12. 9. – 25. 9. 2022 100% 100% planned Regular maintenance at UGS Uhřice
13.9 - 26.9.2021  100% 100% planned Regular maintenance at UGS Uhřice
30. - 31.8.2021 100% 100% planned Maintenance at MS Brumovice – testing of alarm/shutdown sequences
14. – 22. 9. 2020 100% 100% planned Limitation caused by TSO (Net4Gas), repair works of pipeline DN 700 RU Mutěnice – TU Diváky
14.9. – 27.9.2020 100% 100% planned Regular maintenance at UGS Uhřice
3.6. – 16.6.2019 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2018, 1.11.2018 50% 50% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
13.9.2018, 20.9.2018 17% 17% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
10.9.2018 – 23.9.2018 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2017 – 12.11.2017 100% 100% planned Maintenance at MS Brumovice
Available daily firm/interruptible capacity
Date Daily Firm Rate Daily Interruptible Rate
Injection Withdrawal Injection Withdrawal
27.7.2024 N/A N/A 0 -9 995 330
28.7.2024 0 -5 000 000 0 -10 000 010
29.7.2024 0 -5 000 000 0 -10 000 010